top of page
hydroelectric power plant aerial view

HYDROELECTRIC CENTRAL

2 10-tonne overhead travelling cranes

Kiewit

2 overhead travelling cranes with a capacity of 10 tons, for temporary use during construction of Ontario Power's Lower Matagami River Dam in Kapuskasing, with in-cab control.

Hydro-Québec

A “Side connect” overhead crane with a capacity of 10 tons for new substation – End of the island in Montreal

10-tonne side connect overhead crane
50-tonne overhead crane

Neilson/Pomereau

Overhead crane with a capacity of 50 tons for the Yellow Falls hydroelectric dam in Ontario

bottom of page